No account · No card · No upload
See a Sample Bid.
Explore a published, redacted bank-renovation analysis, then watch how quantities, pricing and proposals are reviewed in BidEngine.
01 · Source documents
Start with the bid package.
The public report records the scope and questions identified for a 4,625 SF interior bank branch renovation. Original project files are not included in this public package.
Read the redacted source report02 · Analyzed scope
Interior bank branch renovation
4,625 SF · Redacted public analysis · Selected trades

Selective demolition
Report page 3 · Condensed from the redacted analysis
- •Remove designated customer-area carpet tile and entry mats.
- •Remove customer-facing furniture and prepare affected surfaces.
- •Flooring behind the teller line remains; vault carpet needs confirmation.
Questions to resolve before pricing
- Confirm whether the branch stays open and what phasing is required.
- Confirm vault carpet scope and supervised access.
- Coordinate furniture installation after flooring and specialty-vendor sequencing.
- Keep the electrical service room accessible and operational.
03 · Quantity verification
Project area is not a takeoff quantity.
The report’s 4,625 SF project area does not establish paintable wall area, flooring replacement quantities or demolition quantities. Confirm drawing dimensions, finish schedules, retained areas and the vault scope before pricing each trade.
In the estimating workspace, inspect source references where available and verify inferred quantities. This sample package does not contain an approved measured takeoff.
04 · Editable pricing · Academy demonstration
Review and adjust the estimate.
Watch the estimating lesson to see quantities, units and pricing reviewed before approval. This recording demonstrates the product; it is not the bank-renovation estimate.

05 · Final proposal · Academy demonstration
From approved numbers to a proposal.
See how the reviewed estimate becomes a client-branded proposal with trade pricing, scope and exclusions. Your company checks the proposal before export and submission. This is a separate demonstration, not the bank-renovation proposal.

A matching approved estimate and proposal are not included in this public sample. No sample prices have been invented.
Trial: card required. Public sample and comparison request: no card required.
BidEngine · Construction bidding software
See the work. Then build your next bid.
Explore the public sample without a card, or start a trial with your own projects and pricing.
7 days · 3 bid analyses · Card required. Your selected plan renews automatically at $500/month (ACCEL) or $1,250/month (GROWTH) unless canceled before the trial ends. No setup fee.