Published redacted output · Sample Bid Analysis

Review a Real BidEngine Scope Analysis.

This anonymized example shows the level of plans and scope analysis produced inside BidEngine and reviewed through the SMC bid process, taken from a real subcontractor bid package. The published report preserves the redacted AI-generated plans analysis from the managed program. It is evidence of the analysis format, not a verified final estimate or approved proposal. Your team must verify any AI output against the original documents. Client name, address and third-party vendor identities have been redacted; every other detail — quantities, scope notes, risks, scheduling considerations — is from the delivered report.

Project Snapshot

Project Type
Interior Bank Branch Renovation
Square Footage
4,625 SF
Bidding Scope
Selective Demo · Flooring · Painting
Program Context
Multi-location Refresh Lite (25 sites)
Schedule
13-week window · Jun–Sep 2026

Executive Overview

Comprehensive interior refresh of an existing 4,625.75 SF bank branch — one of seven locations included in the 2026 Refresh Lite Program covering 25 sites across five states. The renovation focuses on interior finishes, furniture replacement, and technology upgrades within customer-facing spaces while preserving the building structure, mechanical systems, and back-of-house infrastructure.

The existing branch includes 5 active teller positions, 2 24-hour ATMs, 9 workstations, and a drive-up teller facility. Pre-Construction begins May/June 2026, construction commences 06/19/2026, with completion required by 09/22/2026 — a tight 13-week construction window.

Scopes identified (GC responsibility)

  • ● Div 02 — Selective demo: furniture, carpet tile, ACT, HVAC grills, light fixtures, legacy branding
  • ● Div 06 — Millwork: check desks, wood ledge sill & base prep + paint (P-1)
  • ● Div 08 — Doors & frames: paint P-1 semi-gloss; window film + sunshades to BL-1
  • ● Div 09 — Primary scope: flooring, wall paint (Benjamin Moore Chantilly Lace 2121-70), ceiling grid
  • ● Div 26 — Lighting: full LED retrofit, GC-coordinated with [Vendor G]
  • ● Div 32 — Final cleaning & post-construction services

Risks & coordination flags

  • ! 13-week schedule is tight against multi-vendor coordination
  • ! Vault carpet status requires client confirmation before removal
  • ! Bank security governs construction access — vault requires bank supervision
  • ! Electrical service room must remain operational throughout construction
  • ! Vendor sequencing: [Vendor C] furniture must follow flooring completion
  • ! Open question: are [Vendor G] LED & [Vendor A] re-laminate mandatory or 'suggested'?
  • ! Open question: does the bank remain open during construction? Phasing impact on 13-week window

Separate Vendor Scopes (GC coordination only)

[Vendor A]
Teller line re-laminate
[Vendor B]
New check desks supply
[Vendor C]
Lobby furniture install
[Vendor E]
Branding / merchandising
[Vendor F]
Branded music / audio integration
[Vendor G]
LED lighting retrofit
Client Security
CCTV & alarm systems

What the analysis surfaced

  • ● Parsed every drawing sheet, schedule and spec page
  • ● Identified bidding scopes and quantified work items
  • ● Flagged scheduling, access and operational risks
  • ● Cross-referenced finishes, demo and MEP coordination

What you get

  • ● Structured plans analysis tied to your bidding scope
  • ● Trade-by-trade scope breakdown with assumptions
  • ● Prioritized risk register with mitigations
  • ● Coordination notes so nothing is missed at bid time

BidEngine · Construction bidding software

See the work. Then build your next bid.

Explore the public sample without a card, or start a trial with your own projects and pricing.

7 days · 3 bid analyses · Card required. Your selected plan renews automatically at $500/month (ACCEL) or $1,250/month (GROWTH) unless canceled before the trial ends. No setup fee.